Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1567374.015
Citation: 01002
Citation Type: Serious
Abatement Date: 10/05/2023 2
Initial Penalty: $14,502.00
Current Penalty: $14,502.00
Issuance Date: 03/17/2022
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0522000
Contest Date: 04/12/2022
Final Order: 09/05/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/05/2023 | $14,502.00 | 10/05/2023 | Serious | |
Penalty | C: Contested | 04/12/2022 | $14,502.00 | 04/19/2022 | Serious | |
Penalty | Z: Issued | 03/17/2022 | $14,502.00 | 04/19/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(d):Application of control. The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence: (1) authorized employee shall have knowledge of the type and magnitude of the energy, the hazards of the energy to be controlled, and the method or means to control the energy. (2) Machine or equipment shutdown. The machine or equipment shall be turned off or shut down using the procedures established for the machine or equipment. An orderly shutdown must be utilized to avoid any additional or increased hazard(s) to employees as a result of the equipment stoppage. (3) physically locate and operate the energy isolating devices in such a manner as to isolate the machine or equipment from the energy sources. (4) affix lockout or tagout devices to each energy isolating device (5) Prior to starting work on machines that have been locked out or tagged out, verify that isolation and deenergizing of the machine or equipment have been accomplished. a) On or before 12/03/21 the employer did not ensure that employee(s) unjamming packages on the red line conveyer system that ran under the orange line conveyor system that prior to employees reaching into the running conveyors the electrical disconnects that powered the conveyor lines were shut off and locked out prior to performing such task as clearing jams on the conveyer lines.