Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1567319.015
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $10,151.00
Current Penalty: $0.00
Issuance Date: 05/20/2022
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 06/16/2022
Gravity: 10
Report ID: 0418300
Contest Date: 06/03/2022
Final Order: 11/10/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 11/10/2022 | $0.00 | 06/16/2022 | Serious | |
Penalty | C: Contested | 06/07/2022 | $10,151.00 | 06/16/2022 | Serious | |
Penalty | Z: Issued | 05/20/2022 | $10,151.00 | 06/16/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): (a) On or about 11/24/2021, and at times prior to - 900 Goodwin Road, Guntersville, AL., in the hatchery, at the macerator, employees sanitizing and disinfecting the hatchery macerator were exposed to caught-in and struck-by hazards from macerator blades, auger screw conveyors, and other moving parts because the specific LOTO Energy Control Procedure (ECP) for the macerator entitled PDC Hatchery, - Specific LOTO Instructions, and dated 10/18/18 did not include all the required information such as, but not limited to, an explanation of its intended use, steps to isolate energy sources, steps to correctly apply lockout device(s), and steps to follow to verify energy isolation is accomplished and effective.