Violation Detail
Standard Cited: 19100269 L03 I Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1565879.015
Citation: 01002
Citation Type: Serious
Abatement Date: 05/17/2022
Initial Penalty: $8,806.00
Current Penalty: $0.00
Issuance Date: 04/21/2022
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 5
Report ID: 0524530
Contest Date: 05/20/2022
Final Order: 02/12/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/12/2024 | $0.00 | 05/17/2022 | Serious | |
Penalty | C: Contested | 05/23/2022 | $8,806.00 | 05/17/2022 | Serious | |
Penalty | Z: Issued | 04/21/2022 | $8,806.00 | 05/17/2022 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(l)(3)(i):The employer did not establish minimum approach distances no less than the distances computed by Table R-3 for ac systems or Table R-8 for dc systems: On or about November 17, 201, the employer did not establish minimum approach distances for utility line work, and permitted an employee to work within an approximate one foot distance of an energized line.