Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1557005.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $11,396.00
Current Penalty: $6,837.60
Issuance Date: 04/06/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0418200
Contest Date:
Final Order: 06/01/2022
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/01/2022 | $6,837.60 | Serious | ||
| Penalty | Z: Issued | 04/06/2022 | $11,396.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii)(B):The energy control procedure did not clearly and specifically specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: a) Heatset Department - On or about October 7, 2021, the employer exposed employees to burn hazards, in that the employer failed to provide specific procedural steps for shutting down, isolating and securing machines to control hazardous energy such as Steam energy (10 bars) for employees operating Super Ba Heatset tunnel (Model # TVP3 & Serial # 58507-9) when the temperature of inside heatset tunnel can be at 290 degree Fahrenheit.