Violation Detail
Standard Cited: 19100303 G02 I General.
Inspection Nr: 1550373.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $7,252.00
Current Penalty: $4,713.80
Issuance Date: 02/24/2022
Nr Instances: 3
Nr Exposed: 30
Abatement Date:
Gravity: 5
Report ID: 0214500
Contest Date:
Final Order: 03/21/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/21/2022 | $4,713.80 | Serious | ||
Penalty | Z: Issued | 02/24/2022 | $7,252.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.303(g)(2)(i):Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i): a) Cooling system 480 Volts: The electrical panel box cover for the water cooling system was open, exposing employees to electrical hazards, on or about 9/7/21. b) Warehouse, Winder#4: The electrical panel box cover for the water cooling system was open, exposing employees to electrical hazards, on or about 9/7/21 c) Cooling system 480 volts: The electrical panel box cover for the water cooling system was open, exposing employees to electrical hazards, on or about 1/26/22