Standard Cited: 19100269 A03 III Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1539931.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,288.00
Current Penalty: $0.00
Issuance Date: 10/26/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/22/2021
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 12/15/2021
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/15/2021 | $0.00 | 11/22/2021 | Serious | |
Penalty | Z: Issued | 10/26/2021 | $12,288.00 | 11/22/2021 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(a)(3)(iii):The contract employer and the host employer did not coordinate their work rules and procedures so that each employee of the contract employer and the host employer was protected as required by this section: (a) On or about June 29, 2021, two employees installing electrical equipment were exposed to an electrical hazard when the employer did not coordinate their work rules and procedures with the host employer.