Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1532295.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $13,653.00
Issuance Date: 10/13/2021
Nr Instances: 1
Nr Exposed: 28
Abatement Date: 11/08/2021
Gravity: 10
Report ID: 0316700
Contest Date:
Final Order: 10/27/2021
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/27/2021 | $13,653.00 | 11/08/2021 | Serious | |
Penalty | Z: Issued | 10/13/2021 | $13,653.00 | 11/08/2021 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: (a) Wareroom - Air valves for packer conveyor lines, including the Cullet Gate on 1D Packer, were underneath the conveyor lines, so employees had to go underneath the machinery to lockout/tagout the air valves, exposing employees to getting struck-by and caught-in moving machine parts when accessing an energy isolating device, on or about May 10, 2021. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photograph or video evidence of abatement or other written records.