Violation Detail
Standard Cited: 19260858 D Removal of steel construction.
Inspection Nr: 1525535.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $13,653.00
Issuance Date: 10/12/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/30/2021
Gravity: 10
Report ID: 0420300
Contest Date:
Final Order: 11/05/2021
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/05/2021 | $13,653.00 | 11/30/2021 | Serious | |
Penalty | Z: Issued | 10/12/2021 | $13,653.00 | 10/29/2021 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.858(d): Any structural member being dismembered shall not be overstressed. Bonner Bridge, North Carolina: On or about April 14, 2021, the employer carried out the demolition operation of the last two steel girder navigation spans over an inlet in such a way that the structural steel girders with concrete decking may have been overloaded beyond their load-carrying capacities. An employee was exposed to the struck-by hazard.