Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1525210.015
Citation: 01002
Citation Type: Other
Abatement Date: 10/15/2021 2
Initial Penalty: $7,802.00
Current Penalty: $5,000.00
Issuance Date: 09/27/2021
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0627500
Contest Date:
Final Order: 11/17/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/17/2021 | $5,000.00 | 10/15/2021 | Other | |
Penalty | Z: Issued | 09/27/2021 | $7,802.00 | 10/15/2021 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.304(g)(5):The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: Drilling Site: On or about April 08, 2021, the employer did not ensure the Lube Roll-Off trailer and crew quarters were grounded which are located on a Hydrogen Sulfide field and are powered by portable power. This condition exposed employees to fire and electrical shock hazards.