Violation Detail
Standard Cited: 19260451 C02 III General requirements.
Inspection Nr: 1518197.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,096.00
Current Penalty: $4,096.00
Issuance Date: 08/24/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/20/2021
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 11/18/2021
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 08/24/2021 | $4,096.00 | 09/20/2021 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(c)(2)(iii): Unstable objects were used as working platforms: (a) Building 5 (500): On or about March 2, 2021, an arrangement of six 2" x 6" wooden planks and two job-made wooden ladders were used as the working platform to hang drywall in an elevator shaft, exposing employees to a 30 ft-9in fall hazard.