Violation Detail
Standard Cited: 19100305 B01 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1499132.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,753.00
Current Penalty: $6,220.00
Issuance Date: 04/12/2021
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 04/20/2021
Gravity: 5
Report ID: 0316400
Contest Date:
Final Order: 06/04/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/04/2021 | $6,220.00 | 04/20/2021 | Serious | |
Penalty | Z: Issued | 04/12/2021 | $9,753.00 | 04/20/2021 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.305(b)(1)(ii):Unused openings in boxes, cabinets, or fittings were not effectively closed: (a) Hammer - On or about 10/14/2020, a cabinet containing a 480V frequency drive was not effectively closed, exposing employees to electric shock hazards.