Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1476192.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $9,831.00
Current Penalty: $5,898.60
Issuance Date: 07/16/2020
Nr Instances: 2
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 08/18/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/18/2020 | $5,898.60 | Serious | ||
Penalty | Z: Issued | 07/16/2020 | $9,831.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded or guards were not designed and constructed to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s) (a) South Cascade - On or about May 22, 2020 the chiller process was not guarded exposing the operator to a caught-in hazard. (b) North Cascade - On or about May 22, 2020 the chiller process was not guarded exposing the operator to a caught-in hazard.