Powered by GoogleTranslate

Violation Detail

Standard Cited: 19260416 A01 General requirements.

Inspection Nr: 1472400.015

Citation: 01002

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $13,494.00

Current Penalty: $12,144.60

Issuance Date: 10/09/2020

Nr Instances: 1

Nr Exposed: 8

Abatement Date: 11/05/2020

Gravity: 10

Report ID: 0420600

Contest Date:

Final Order: 11/03/2020

Related Event Code (REC): A

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 11/03/2020 $12,144.60 11/05/2020 Serious  
Penalty Z: Issued 10/09/2020 $13,494.00 11/05/2020 Serious  

Text For Citation: 01 Item/Group: 002 Hazard:

29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a. On or about April 13, 2020, at the W. Lake Eloise Drive Roadway project, employees installing a dewatering system in close proximity to an overhead power line energized at 7.6 kV were exposed to an electrocution hazard.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.