Violation Detail
Standard Cited: 19260454 B02 Training requirements.
Inspection Nr: 1465787.015
Citation: 01002
Citation Type: Other
Abatement Date: 09/16/2020 2
Initial Penalty: $3,856.00
Current Penalty: $3,856.00
Issuance Date: 08/20/2020
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity:
Report ID: 0830600
Contest Date:
Final Order: 09/17/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/17/2020 | $3,856.00 | 09/16/2020 | Other | |
Penalty | Z: Issued | 08/20/2020 | $3,856.00 | 09/16/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.454(b)(2): The employer did not have each employee who was involved in erecting, disassembling, moving, operating, repairing, maintaining, or inspecting a scaffold trained by a competent person to recognize any hazards associated with the correct procedures for erecting, disassembling, moving, operating, repairing, inspecting, and maintaining the type of scaffold in question: a) On or about February 26, 2020 and at times prior, employees operating aerial lifts at the jobsite were not provided with adequate instruction on proper and safe operation of the lifts.