Violation Detail
Standard Cited: 19260652 C03 III Requirements for protective systems.
Inspection Nr: 1461935.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $7,422.00
Current Penalty: $7,422.00
Issuance Date: 04/08/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 04/14/2020
Gravity: 5
Report ID: 0521700
Contest Date:
Final Order: 05/04/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 04/08/2020 | $7,422.00 | 04/14/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.652(c)(3)(iii): At least one copy of the tabulated data, which identifies the registered professional engineer who approved the data, shall be maintained at the jobsite during construction of the protective system. After that time the data may be stored off the jobsite, but a copy of the data shall be made available to the Secretary upon request. a. On or about February 10, 2020, at the above addressed jobsite, employees were performing a sewer clean out to the main sewer line in a trench measured at eight (8) feet one (1) inches in depth. The employer did not have or provide a copy of the tabulated data at the jobsite during construction of the protective system.