Violation Detail
Standard Cited: 19100147 C06 I A The control of hazardous energy (lockout/tagout).
Inspection Nr: 1458601.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,639.00
Current Penalty: $5,445.65
Issuance Date: 02/05/2020
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 03/24/2020
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 03/03/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/03/2020 | $5,445.65 | 03/24/2020 | Serious | |
Penalty | Z: Issued | 02/05/2020 | $9,639.00 | 03/24/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i)(A): The periodic inspection of the energy control procedure was not performed by an authorized employee other than the one utilizing the energy control procedure being inspected. On 1/28/2020, at the Duluth facility, the employer permitted a single Authorized employee to review specific written procedures and certify they had been reviewed.