Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1456195.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,494.00
Current Penalty: $8,096.40
Issuance Date: 05/29/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/15/2020
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 06/22/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/22/2020 | $8,096.40 | 06/15/2020 | Serious | |
Penalty | Z: Issued | 05/29/2020 | $13,494.00 | 06/15/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedure did not clearly and specifically outline the procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. a) On or about January 14, 2019, in the Extrusion Building, employees were using a Belco Log Oven and Shear Machine (#3216500) without the employer having specific Lockout/Tagout procedures to address the Pneumatic energy of the machine.