Violation Detail
Standard Cited: 19260960 B02
This violation item has been deleted.
Inspection Nr: 1446331.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,494.00
Current Penalty: $0.00
Issuance Date: 04/15/2020
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 06/04/2020
Gravity: 10
Report ID: 0636900
Contest Date:
Final Order: 05/04/2020
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/04/2020 | $0.00 | 06/04/2020 | Serious | |
Penalty | Z: Issued | 04/15/2020 | $13,494.00 | 06/04/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.960(b)(2): Treat as energized. Electric lines and equipment shall be considered and treated as energized unless they have been deenergized in accordance with � 1926.961. On or about November 20, 2019, the employer did not ensure that electrical lines (Transformer lines) were considered and treated as energized, exposing employees to electrocution hazards.