Violation Detail
Standard Cited: 19100269 A02 I B Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1445072.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,012.00
Current Penalty: $5,407.20
Issuance Date: 02/10/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 02/26/2020
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 03/27/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/27/2020 | $5,407.20 | 02/26/2020 | Serious | |
| Penalty | Z: Issued | 02/10/2020 | $9,012.00 | 02/26/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(a)(2)(i)(B): Each employee shall also be trained in and familiar with any other safety practices, including applicable emergency procedures (such as pole-top and manhole rescue), that are not specifically addressed by this section but that are related to his or her work and are necessary for his or her safety: (a) A.H. McCoy Federal Building Electrical Vault - On or about November 13, 2019 employees performing phase test were exposed to burn hazard. The exposed employees were not trained to wear arc flash protective clothing when phasing.
Translate