Violation Detail
Standard Cited: 19100119 F04 Process safety management of highly hazardous chemicals.
Inspection Nr: 1438584.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $13,494.00
Current Penalty: $13,494.00
Issuance Date: 04/09/2020
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 05/27/2020
Gravity:
Report ID: 0626700
Contest Date:
Final Order: 04/24/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/24/2020 | $13,494.00 | 05/27/2020 | Other | |
| Penalty | Z: Issued | 04/09/2020 | $13,494.00 | 05/27/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(d)(5)(ii) : When there was a possibility of reaccumulation of stored energy to a hazardous level, verification of isolation was not continued until the servicing or maintenance is completed, or until the possibility of such accumulation no longer exists. a) On or about October 17th 2019, in the Maya Structure-I at Shell Deer Park Refinery, the employer did not recognize the possibility of re-accumulation of energy and continue verification of isolation.
Translate