Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1437804.015
Citation: 01002
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,048.00
Current Penalty: $2,509.76
Issuance Date: 04/08/2020
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 10
Report ID: 0213400
Contest Date:
Final Order: 05/04/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/04/2020 | $2,509.76 | Serious | ||
Penalty | Z: Issued | 04/08/2020 | $4,048.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(f)(6): The clearance between scaffolds and 26KV uninsulated power lines was not a minimum of 10 feet when scaffolds were erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines: A) 187 Quincy Ct Hopelawn, NJ 08816 Employees were installing a Alum-A-Pole extension support pole that measured 53' 6" and they did not maintain a clearance distance of 10ft from the uninsulated 26KV overhead power line. Condition noted on or about 10/11/19