Violation Detail
Standard Cited: 19260451 E01 General requirements.
Inspection Nr: 1437092.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,470.00
Current Penalty: $3,470.00
Issuance Date: 01/23/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/26/2020
Gravity: 5
Report ID: 0420300
Contest Date:
Final Order: 01/24/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/24/2020 | $3,470.00 | 02/26/2020 | Serious | |
| Penalty | Z: Issued | 01/23/2020 | $3,470.00 | 02/26/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(e)(1): When scaffold platforms were more than 2 feet (0.6 m) above or below a point of access, portable ladders, hook-on ladders, attachable ladders, stair towers (scaffold stairways/towers), stairway-type ladders (such as ladder stands), ramps, walkways, integral prefabricated scaffold access, or direct access from other scaffold, structure, personnel hoist, or similar surface was not used. On or before October 7, 2019, employer permitted employees to climb a 35ft. Hydro Mobile M2 series mast climbing work platforms (MCWPs) without a means of access.
Translate