Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1426378.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,446.00
Current Penalty: $9,446.00
Issuance Date: 02/12/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/25/2020
Gravity:
Report ID: 0626300
Contest Date:
Final Order: 03/03/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/03/2020 | $9,446.00 | 02/25/2020 | Other | |
| Penalty | Z: Issued | 02/12/2020 | $9,446.00 | 02/25/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.416(a)(1): When an employee was not protected against electric shock by de-energizing the circuit and grounding it or by guarding it effectively by insulation or other means, the employer permitted an employee to work in proximity to a part of an electric power circuit that the employee could contact the electric power circuit in the course of work: a) The employer permitted employees to work in proximity to electric power circuits who were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means.
Translate