Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1415628.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $8,525.00
Current Penalty: $3,000.00
Issuance Date: 08/01/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 09/18/2019
Gravity:
Report ID: 0729300
Contest Date:
Final Order: 08/22/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/22/2019 | $3,000.00 | 09/18/2019 | Other | |
| Penalty | Z: Issued | 08/01/2019 | $8,525.00 | 09/18/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: On or about 07/16/2019, MOST Inc., located at 50 Cherry Blossom Way, Troy, MO, did not conduct a complete periodic inspections of their Energy (LO/TO) Program. There were at least 3 authorized employees that were missed within the latest inspection/review. The employer had various furnaces with multiple electrical sources to lockout along with gas supply and chemical supply processes to lockout.