Violation Detail
Standard Cited: 19100147 F01 V The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1414380.015
Citation: 01002
Citation Type: Serious
Abatement Date: 08/22/2019
Initial Penalty: $13,260.00
Current Penalty: $0.00
Issuance Date: 08/15/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0625400
Contest Date:
Final Order: 10/29/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/29/2019 | $0.00 | 08/22/2019 | Serious | |
Penalty | Z: Issued | 08/15/2019 | $13,260.00 | 08/22/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(f)(1)(v): All systems were not de-energized and energy control measures reapplied in accordance with paragraph (d) of this section to continue the servicing and/or maintenance: On or about July 3, 2019, employees were conducting maintenance on the Siemens Dematic conveyor belt and did not reapply the locks to the make adjustments to the belt, exposing employee to the hazard of being caught in the conveyor belt.