Violation Detail
Standard Cited: 19100269 A04 Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1412475.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,747.00
Current Penalty: $3,978.00
Issuance Date: 12/23/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 01/03/2020
Gravity: 5
Report ID: 0625700
Contest Date:
Final Order: 01/23/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/23/2020 | $3,978.00 | 01/03/2020 | Serious | |
Penalty | Z: Issued | 12/23/2019 | $6,747.00 | 01/03/2020 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(a)(4): Existing characteristics and conditions of electric lines and equipment that were related to the safety of the work to be performed was not determined before work on or near the lines or equipment was started. Such characteristics and conditions include, but not limited to 1910.269(a)(4)(i) through 1910.269(a)(4)(viii): On or about June 25, 2019, north side of an electrical pole, employees were running a new electrical line from an ungrounded utility service truck to replace a damaged 14.4KVA electrical line to restore power to local residence.