Violation Detail
Standard Cited: 19100147 C07 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1405047.015
Citation: 01002
Citation Type: Serious
Abatement Date: 11/26/2019 2
Initial Penalty: $8,525.00
Current Penalty: $5,000.00
Issuance Date: 10/30/2019
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0213900
Contest Date:
Final Order: 11/26/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/26/2019 | $5,000.00 | 11/26/2019 | Serious | |
Penalty | Z: Issued | 10/30/2019 | $8,525.00 | 11/26/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(7)(i): The employer did not provide training to ensure that the purpose and function of the energy control program are understood by employees and that the knowledge and skills required for the safe application, usage, and removal of the energy controls are acquired by employees. a) CJ TMI Manufacturing America, LLC - Noodle Line: The employer did not ensure that authorized employees were trained on all aspects of the LOTO program and all specific procedures for each individual machine or equipment identified in the program that was used by each authorized employee as part of their job duty, observed on or about 05/28/2019. b) CJ TMI Manufacturing America, LLC - Mixing Ingredient room: The employer did not ensure that authorized employees were trained on all aspects of the LOTO program and all specific procedures for each individual machine or equipment identified in the program that was used by each authorized employee as part of their job duty, observed on or about 06/10/2019.