Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1396220.015
Citation: 01002
Citation Type: Serious
Abatement Status:
Initial Penalty: $9,661.00
Current Penalty: $0.00
Issuance Date: 06/26/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/23/2019
Gravity: 5
Report ID: 0418300
Contest Date: 07/17/2019
Final Order: 02/06/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 02/06/2020 | $0.00 | 07/23/2019 | Serious | |
| Penalty | C: Contested | 07/18/2019 | $9,661.00 | 07/23/2019 | Serious | |
| Penalty | Z: Issued | 06/26/2019 | $9,661.00 | 07/23/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) On or about 04/26/2019 - Pouch Department, a periodic inspection of the energy control procedure(s) had not been performed at least annually for equipment such as, but not limited to, the Poucher machine #3 (Serial Number 1272).
Translate