Violation Detail
Standard Cited: 19260602 D Material handling equipment.
Inspection Nr: 1395485.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,978.00
Current Penalty: $2,386.80
Issuance Date: 05/10/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/10/2019
Gravity: 1
Report ID: 0636900
Contest Date:
Final Order: 06/03/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/03/2019 | $2,386.80 | 06/10/2019 | Serious | |
| Penalty | Z: Issued | 05/10/2019 | $3,978.00 | 06/10/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.602(d): Training did not consist of a combination of formal instruction (e.g., lecture, discussion, interactive computer learning, video tape, written material), practical training (demonstrations performed by the trainer and practical exercises performed by the trainee), and evaluation of the operator's performance in the workplace as required by paragraph 29 CFR 1910.178(l). At a construction site located at 2850 Lubbuck St., Fort Worth, Texas. the employer did not train operators on the safe operation of the mini excavator exposing them to rollover hazards.
Translate