Violation Detail
Standard Cited: 19260405 G02 IV Wiring methods, components, and equipment for general use.
Inspection Nr: 1391815.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,842.00
Current Penalty: $2,842.00
Issuance Date: 10/01/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0215000
Contest Date:
Final Order: 10/28/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 10/01/2019 | $2,842.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.405(g)(2)(iv): Flexible cords were not connected to devices and fittings so that strain relief is provided which will prevent pull from being directly transmitted to joints or terminal screws; a) Electric wires (110v) were spliced together with wire caps and were hanging unsupported in the work area exposed to damage during construction/ demolition activities. Employees were exposed to electric shock hazard. Location: 94 Avenue A, New York NY On or about 4/3/2019 NOTE: BECAUSE ABATEMENT OF THIS VIOLATION IS ALREADY DOCUMENTED IN THE CASEFILE, THE EMPLOYER NEED NOT SUBMIT CERTIFICATION NOR DOCUMENTATION OF ABATEMENT OF THIS VIOLATION AS NORMALLY REQUIRED BY 29 CFR 1903.19.
Translate