Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1391183.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,525.00
Current Penalty: $8,525.00
Issuance Date: 09/26/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/30/2019
Gravity: 5
Report ID: 0112600
Contest Date: 11/15/2019
Final Order: 06/23/2023
Related Event Code (REC): A;R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | 2: Appeals Court | 06/23/2023 | $8,525.00 | 10/30/2019 | Serious | |
Penalty | C: Contested | 11/19/2019 | $8,525.00 | 10/30/2019 | Serious | |
Penalty | Z: Issued | 09/26/2019 | $8,525.00 | 10/30/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) Site: In Building 1, at the Coating Line, at the Big Spindle, 130 Riverdale Street, Northbridge, MA 01534: On 4/26/2019 the employer had not conducted a periodic inspection of Energy Control Procedure RMC-022 for the Big Spindle since 4/26/2016.