Violation Detail
Standard Cited: 19260250 B08 I General requirements for storage.
This violation item has been deleted.
Inspection Nr: 1382418.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $11,934.00
Current Penalty: $0.00
Issuance Date: 08/22/2019
Nr Instances: 3
Nr Exposed: 25
Abatement Date:
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 09/18/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/18/2019 | $0.00 | Serious | ||
Penalty | Z: Issued | 08/22/2019 | $11,934.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.250(b)(8)(i): Used lumber did not have all nails withdrawn before stacking. Location - 189 Vasser Street, Cambridge, MA. Fourth floor deck. On or about February 28, 2019, employees were exposed to protruding nails where scrap wood was stowed in several locations on multiple floors.