Violation Detail
Standard Cited: 19260025 A Housekeeping.
Inspection Nr: 1381784.015
Citation: 01002
Citation Type: Other
Abatement Date: 02/02/2022 7
Initial Penalty: $2,842.00
Current Penalty: $1,421.00
Issuance Date: 08/13/2019
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0213100
Contest Date: 06/02/2021
Final Order: 02/02/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/02/2022 | $1,421.00 | 02/02/2022 | Other | |
Penalty | C: Contested | 08/18/2021 | $2,842.00 | 08/19/2019 | Serious | |
Penalty | Z: Issued | 08/13/2019 | $2,842.00 | 08/19/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.25(a): During the course of construction, alteration, or repairs, form or scrap lumber with protruding nails was not kept clear from work areas: a) 16 Silver Terrace - On or about February 27, 2019 and at times prior thereto, the work site was covered in scrap lumber with protruding nails, unused coils of nails, and various pieces of lumber throughout the area where employees were working.