Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1377158.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,856.00
Current Penalty: $4,428.00
Issuance Date: 05/10/2019
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 06/17/2019
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 05/29/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/29/2019 | $4,428.00 | 06/17/2019 | Serious | |
Penalty | Z: Issued | 05/10/2019 | $8,856.00 | 06/17/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: a) On or about 2/8/2019, Employer had not completed their annual periodic inspections with any of their maintenance employees which are LOTO authorized.