Violation Detail
Standard Cited: 19100147 C06 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1374883.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,246.00
Current Penalty: $4,650.00
Issuance Date: 05/31/2019
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 07/18/2019
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 07/02/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/02/2019 | $4,650.00 | 07/18/2019 | Serious | |
Penalty | Z: Issued | 05/31/2019 | $7,246.00 | 07/18/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i)(B): The periodic inspection of the energy control procedure was not conducted to correct any deviations or inadequacies identified: Garick, LLC, Cumming, GA - In the bulk mill and bagging area, employees repaired and maintained the equipment. The specific written procedures did not include the magnitude of energies. The periodic inspection was not conducted, on or about 1/30/19.