Violation Detail
Standard Cited: 19100269 D03 I Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1370398.015
Citation: 01002
Citation Type: Serious
Abatement Date: 07/15/2019
Initial Penalty: $11,934.00
Current Penalty: $0.00
Issuance Date: 07/02/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A;R
Gravity: 10
Report ID: 0215600
Contest Date: 07/19/2019
Final Order: 11/12/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/12/2019 | $0.00 | 07/15/2019 | Serious | |
Penalty | C: Contested | 07/22/2019 | $11,934.00 | 07/15/2019 | Serious | |
Penalty | Z: Issued | 07/02/2019 | $11,934.00 | 07/15/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(d)(3)(i): Locks, tags, chains, wedges, key blocks, adapter pins, self-locking fasteners, or other hardware were not provided by the employer for isolating, securing, or blocking of machines or equipment from energy sources: (a) Unit 10 switchyard - The low side of the transformer was energized. The doors to LB91 were not locked out or tagged to prevent access by an employee who was exposed to live parts; on or about 01/07/19. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $ 1,000.00 AS PER 29 CFR 1903.19.