Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1368442.015
Citation: 01002
Citation Type: Serious
Abatement Date: 04/01/2019 2
Initial Penalty: $13,260.00
Current Penalty: $0.00
Issuance Date: 02/25/2019
Nr Instances: 2
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 03/13/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/13/2019 | $0.00 | 04/01/2019 | Serious | |
Penalty | Z: Issued | 02/25/2019 | $13,260.00 | 04/01/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected: a) The periodic inspection of the Salvagnini S4 did not include a review between the inspector and each authorized employee. b) The periodic inspection of the Pack-out transfer conveyor did not include a review between the inspector and each authorized employee.