Violation Detail
Standard Cited: 19100269 U05 II Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1362353.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,086.00
Current Penalty: $24,020.00
Issuance Date: 01/04/2019
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 04/03/2020
Gravity: 5
Report ID: 0213100
Contest Date: 01/29/2019
Final Order: 03/27/2020
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/27/2020 | $24,020.00 | 04/03/2020 | Serious | |
| Penalty | C: Contested | 02/20/2019 | $11,086.00 | 01/10/2019 | Serious | |
| Penalty | Z: Issued | 01/04/2019 | $11,086.00 | 01/10/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.269(u)(5)(ii): Guarding of energized parts within a compartment during operation and maintenance functions to prevent accidental contact with energized parts and to prevent dropped tools or other equipment from contacting energized parts, except for fuse replacement and other necessary access by qualified persons, was not maintained. a) 481 Unionville Feura Bush Road, Feura Bush, NY, on November 21, 2018 and at prior times the employer did not maintain guarding of energized parts, resulting in an employee receiving electric shock.