Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1354960.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,630.00
Current Penalty: $4,400.00
Issuance Date: 03/07/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 05/17/2019
Gravity: 5
Report ID: 0213900
Contest Date:
Final Order: 04/05/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/05/2019 | $4,400.00 | 05/17/2019 | Serious | |
Penalty | Z: Issued | 03/07/2019 | $6,630.00 | 04/02/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Northeast Precast LLC.- Throughout the manufacturing plant: The employer did not conduct a periodic inspection at least annually on the lockout/tagout procedures (Last effective date: October 1, 2016), occurred on or about 10/03/2018.