Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 1352641.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,282.00
Current Penalty: $9,282.00
Issuance Date: 03/21/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/27/2019
Gravity: 10
Report ID: 0316100
Contest Date: 04/10/2019
Final Order: 08/28/2019
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 08/28/2019 | $9,282.00 | 03/27/2019 | Serious | |
| Penalty | C: Contested | 04/12/2019 | $9,282.00 | 03/27/2019 | Serious | |
| Penalty | Z: Issued | 03/21/2019 | $9,282.00 | 03/27/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.416(a)(3): Before work began, the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into pysical or electrical contact with the electric power circuit: a) Solar Pad #26, Meter Cabinet - An electrician entered into an electrical meter cabinet to install wiring and the service within the cabinet was not determined to be de-energized, which caused the electrician to get to close to an energized live part where an arc flash occurred, 13,200 volt service, on or about 09/28/2018. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the Certification of Corrective Action Worksheet), in addition, documentation demonstrating the abatement is complete must be included with your certification. This documentation may include, but is not limited to evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.