Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1351001.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,147.00
Current Penalty: $5,500.00
Issuance Date: 01/07/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/22/2019
Gravity: 5
Report ID: 0418600
Contest Date:
Final Order: 02/01/2019
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/01/2019 | $5,500.00 | 01/22/2019 | Serious | |
| Penalty | Z: Issued | 01/07/2019 | $9,147.00 | 01/22/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) Molding Shop - The employer had not conducted periodic inspections of the energy control procedures for machines such as but not limited to molding machine A-10.