Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1343561.015
Citation: 01002
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $8,525.00
Current Penalty: $4,000.00
Issuance Date: 02/05/2019
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/11/2019
Gravity: 5
Report ID: 0418100
Contest Date: 03/04/2019
Final Order: 01/16/2020
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/16/2020 | $4,000.00 | 03/11/2019 | Serious | |
| Penalty | C: Contested | 03/05/2019 | $8,525.00 | 03/11/2019 | Serious | |
| Penalty | Z: Issued | 02/05/2019 | $8,525.00 | 03/11/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.37(a)(3): Exit route(s) were not kept free and unobstructed: a) Facility - On or about 08/29/18 and at times prior thereto the exit route discharging to the front of the building was obstructed with stored materials. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Translate