Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1333125.015
Citation: 01002
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 08/23/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/19/2018
Gravity:
Report ID: 1032500
Contest Date:
Final Order: 09/24/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/24/2018 | $0.00 | 09/19/2018 | Other | |
| Penalty | Z: Issued | 08/23/2018 | $0.00 | 09/19/2018 | Other |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: (a) Dryer Room, on or about July 24, 2018, and at times prior thereto, the procedures for locking out the dryer drum were not audited at least annually. NOTE: Abatement certification IS required for this item.
Translate