Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 1330859.015
Citation: 01002
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,880.00
Current Penalty: $3,880.00
Issuance Date: 09/24/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0112600
Contest Date:
Final Order: 10/26/2018
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 09/24/2018 | $3,880.00 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.850(a): Evidence in writing was not available that an engineering survey performed by a competent person had been performed prior to permitting employee(s) to start demolition operations: 37 Mechanic Street, Leominster, MA: On or about July 18, 2018 the employer had not provided evidence in writing that an engineering survey was conducted by a competent person prior to permitting employees to start demolition operations. Specific abatement documentation that this violation has been corrected must be provided within 10 days of the abatement in accordance with 29 CFR 1903.19(d)(1)