Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1314828.015
Citation: 01002
Citation Type: Serious
Abatement Date: 06/27/2018 2
Initial Penalty: $12,934.00
Current Penalty: $7,400.00
Issuance Date: 06/19/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 10
Report ID: 0418600
Contest Date:
Final Order: 07/11/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/11/2018 | $7,400.00 | 06/27/2018 | Serious | |
Penalty | Z: Issued | 06/19/2018 | $12,934.00 | 06/27/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a) On or about April 4, 2018 and times prior no lockout/tagout specific procedures: The employer failed to ensure an employee who replaced the main drive shaft on the PBR Mill properly locked out all energy sources due to no specific procedures available to indicate the energy sources such as electric, hydraulic, and pneumatic and the procedures to de-energize them and control them.