Violation Detail
Standard Cited: 19100119 D03 I D Process safety management of highly hazardous chemicals.
Inspection Nr: 1312169.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,641.00
Current Penalty: $11,641.00
Issuance Date: 10/02/2018
Nr Instances: 3
Nr Exposed: 182
Abatement Date: 04/02/2021
Gravity: 10
Report ID: 0523900
Contest Date:
Final Order: 10/24/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/24/2018 | $11,641.00 | 04/02/2021 | Serious | |
Penalty | Z: Issued | 10/02/2018 | $11,641.00 | 02/21/2019 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.119(d)(3)(i)(D): The employers relief system design and design calculation for 15G-SV006, High Pressure Receiver Relief Valve and the flare were not adequately performed: a) Superior Refining Company; On or about April 26, 2018, the 15G-SV006 relief valve sizing document provided indicated the calculations were performed for pressure relief of the High Pressure Receiver (15G-V07), Primary Absorber (15G-V08), Sponge Absorber (15G-V09) and Water Knockout Drum (15G-V13). The calculations failed to include piping and vessels from the discharge of the gas compressors to the Stripper Column (including the High Pressure (HP) Receiver Condensers, HP Receiver, HP Receiver Water Knockout Drum, Primary Absorber, Sponge Absorber, and Stripper Column). b) Superior Refining Company; On or about April 26, 2018, the 15G-SV006 relief valve sizing document backpressure calculation included the discharge piping and elbows to the flare header (measuring less than 30 feet total length); however, the calculation failed to include the full length to the flare (flare header continues for over 100 feet to the flare), as well as, the possible flows and pressures from other relief devices in the common flare header.