Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1309288.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,638.00
Current Penalty: $6,180.00
Issuance Date: 05/11/2018
Nr Instances: 1
Nr Exposed: 22
Abatement Date: 12/03/2018
Gravity: 5
Report ID: 0418100
Contest Date:
Final Order: 05/30/2018
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | $6,180.00 | 12/03/2018 | Serious | ||
Penalty | I: Informal Settlement | 05/30/2018 | $6,180.00 | 08/15/2018 | Serious | |
Penalty | Z: Issued | 05/11/2018 | $8,638.00 | 06/28/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: Trojan Battery Company, LLC, Lithonia, GA - At the plant, Maintenance Technicians, Team Leaders and Operators performed maintenance and cleaning of the equipment including but not limited to lines 1-8 in the Oxide Department. The annual periodic inspection had not been performed, on or about 4/17/18.