Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1307890.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,641.00
Current Penalty: $6,984.60
Issuance Date: 09/24/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/29/2018
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 10/19/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/19/2018 | $6,984.60 | 10/29/2018 | Serious | |
Penalty | Z: Issued | 09/24/2018 | $11,641.00 | 10/29/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.119(j)(2): The employer did not establish or implement written procedures to maintain the on-going integrity of process equipment: a) At the facility, where the employer did not include the excess catalyst sample stromen valve and quick check valve attached to reactor DR412 on the B line polymerization in the company's mechanical integrity program.