Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1301861.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,934.00
Current Penalty: $0.00
Issuance Date: 07/12/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/24/2018
Gravity: 10
Report ID: 0112600
Contest Date: 08/06/2018
Final Order: 11/04/2019
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/04/2019 | $0.00 | 07/24/2018 | Serious | |
Penalty | C: Contested | 08/13/2018 | $12,934.00 | 07/24/2018 | Serious | |
Penalty | Z: Issued | 07/12/2018 | $12,934.00 | 07/24/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected. (a) Site: In the production plant at 27 Nashua Street, Leominster, MA 01453, on 4/27/18 the periodic inspection for the Steinmann Laminator did not include a review, between the inspector and each authorized employee who performed the procedure being inspected. (b) Site: In the production plant at 27 Nashua Street, Leominster, MA 01453, on 4/27/18 the periodic inspection for the 414 Flat Cutter did not include a review, between the inspector and each authorized employee who performed the procedure being inspected.