Violation Detail
Standard Cited: 19260451 E09 IV General requirements.
Inspection Nr: 1300684.015
Citation: 01002
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,880.00
Current Penalty: $2,500.00
Issuance Date: 05/23/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 06/19/2018
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 06/07/2018
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/07/2018 | $2,500.00 | 06/19/2018 | Serious | |
| Penalty | Z: Issued | 05/23/2018 | $3,880.00 | 06/19/2018 | Serious |
Text For Citation: 01 Item/Group: 002 Hazard:
29 CFR 1926.451(e)(9)(iv): Cross braces on tubular welded frame scaffolds were used as a means of access or egress. Employees engaged in removing steel beams with the use of a scissor lift, climbed the cross bars to access the platform that was approximately 12 to 15 feet in the air.